Bulk & Volume Orders
Developers, commercial contractors, municipal projects and large installations get volume pricing, phased deliveries and one trade desk contact from bid to final roll. Built for jobs measured in tens of thousands of square feet.
Bulk purchasing advantages
Larger quantities unlock better pricing, but the real advantage is control over consistency and schedule.
Tiered rates on turf, infill and accessories that step down as the project quantity grows.
Rolls for the whole project reserved from one production lot so color matches across phases.
Deliveries scheduled per phase or per lot so material arrives when the crew is ready, not before.
Spec sheets, submittals and price holds so estimators can bid with confidence.
Volume pricing explanation
Three tiers, confirmed in writing per project. Thresholds below are placeholders to be set by the sales team.
Project-based contractor pricing with product recommendation and a single scheduled delivery.
Stepped pricing, reserved dye lot, phased deliveries and a named trade desk contact.
Contract pricing held for the project duration, multi-site or multi-phase logistics, submittal packages.
Process
Large projects live or die on logistics. This is how we run them.
Send total square footage, phases, sites and target dates. Drawings or a specification if available.
We return tiered pricing, reserve the production lot and hold pricing for the project window.
Each phase gets a delivery date coordinated with the site superintendent or crew lead.
Rolls, infill and accessories arrive per phase. The trade desk stays on the project until the last roll.
Large project request
Tell us the scope and the window. Volume pricing and a delivery plan come back within one business day.
Straight answers
What estimators and project managers ask first.
Pricing is held for the project window confirmed in writing, typically 60 to 90 days, and longer under a contract tier.
Yes. Multi-site portfolios receive per-site delivery schedules under one project quote.
Yes. Spec sheets, product data and warranty documentation are supplied for submittal packages and public bids.
Tell the trade desk as soon as scope changes. Reserved lots can usually be adjusted before the first phase ships.
Tell the trade desk the application and square footage. We recommend the product and return contractor pricing.